Loading...

Sport Facilities II continuation Assignment

Open Posted By: surajrudrajnv33 Date: 15/12/2020 Graduate Case Study Writing

Hello everyone, I have an Assignment for you today. This assignment must be DONE by Wednesday,  December 16, 2020, no later than 10 pm. By the way, I need this assignment to be PLAGIARISM FREE & a Spell Check when completed. Make sure you READ the instructions CAREFULLY. Now without further ado, the instructions to the assignments are below:

 

Instructions

Facility Manager Interview: Part II

For this assignment, you will conduct the sports facility manager interview and reflect on the results of that interview. You will write a two-page paper sharing the results of the interview, what you have learned, and how the interview can be applied in your career as a sport facility manager. If you are not planning to be a sport facility manager, write about how this interview applies to what you have learned about basic sport facilities management principles in the assigned readings.

Steps for completing the assignment are as follows:

  1. Conduct the sport facility manager interview at the scheduled date and time.
  2. Read the instructor feedback from your Unit I Assignment, and apply it as you write this paper.
  3. Write the paper. Include in the content:
  4. the answers to the questions that you asked the facility manager,
  5. how this information can be applied to a career managing sport facilities, and  
  6. a summary of what you learned from the interview.
  7. Submit your paper according to the information provided below.

Paper requirements are as follows:

Write a minimum of two double-spaced pages (APA Format).

  • Address the topic of the paper using critical thought. The required information listed above should clearly stand out and be unambiguous. Otherwise, it will be determined to be missing.
  • Ensure that all parts of your paper are formatted according to the APA style as detailed in the approved APA manual.
  • Include a title page that includes:
  • title of paper,
  • your name, and
  • university name.
  • Include an introductory section at the start of your paper.
  • Include the following first-level headings:
  • Answers from an Interview with [sport facility manager]
  • Application to Sport Facilities Management Career
  • Conclusion (what you learned)
  • References are not required for this assignment; however, include a reference page as the final page of your paper if references were used. Ensure that this page is completed and formatted according to the correct APA style.
  • Avoid the serious consequence of plagiarism by using your own words, and include citations for sources you used.
  • As with all discussion board responses and assignments, non-scholarly sources such as Wikipedia and About.com may not be cited in your work.

By the way, I have two attachments below which is a study guide to utilize for this assignment and the previous Interview from part 1 of this assignment to look over. I need a plagiarism report upon completion. If you need more time for this assignment let me know please! And please look over the following instructions above to assure the assignment is thoroughly completed.

Category: Accounting & Finance Subjects: Behavioral Finance Deadline: 12 Hours Budget: $120 - $180 Pages: 2-3 Pages (Short Assignment)

Attachment 1

BSM 4001, Sport Facilities 1

Course Learning Outcomes for Unit II Upon completion of this unit, students should be able to:

1. Recognize the basic principles related to sport facility planning and management. 6. Identify the major trends impacting the planning and management of sport facility equipment. 8. Classify the different components of indoor and outdoor surfaces and components of sport

facilities.

Reading Assignment Chapter 4: Facility Planning Human Kinetics. (n.d.) Chapter 4, clip 4.1 [Video file]. Retrieved from

http://videos.humankinetics.com/services/player/bcpid4169931207001?bckey=AQ~~,AAAA0gHQG- E~,UzAFL1pLzn5XtdLxCUBjqBkJBHSW9sRA

Click here to access the transcript for Video 4.1.

Unit Lesson Welcome to Unit II! In this unit, we will look at facility planning. When proper planning is applied, we, as sport facility managers, can help our venue service grow the widest possible consumer and constituent base. That is why it is important to understand the overall principles when an organization is preparing to build a new facility. Not many buildings are built in the absence of some need. Planners must examine the rationale for building the facility based on solid empirical numbers instead of hunches. Recall the Hiram College renovations in the mid 2000’s that were mentioned in the Unit I lesson. As stated in the lesson, the changes were certainly justified, at least in terms of building the school’s enrollment numbers, by being more competitive in sports. Having an open mind, yet being realistic about what kind of facility is required to meet the needs of the organization, is critical in the sport facility management career field. When you are dealing with millions of dollars to build or renovate an existing facility, you certainly want to make the best decision possible, because the chance to do it right might not come again. Just as an example, Hiram College had not built any significant athletic facilities for nearly 50 years when the new additions and renovations were completed in 2005-2006. A comprehensive planning process is crucial to making sure the right facility is built with all the right components. One option that is discussed in the readings in this unit is the option of leasing instead of building a brand new facility. Check out the first article in the suggested reading section of this unit. It explains the facility cost woes of the Phoenix Coyotes of the National Hockey League (NHL). Would you have leased an existing venue or left the citizens of the community with the mess they have there? Are there also challenges in terms of the area’s climate? You bet. There are also issues with the local and national standards, the amount of funding for the facility, and the pressure exerted by political leaders in the area (Fried, 2015). Regarding political pressure, we hear many stories about how professional team owners use the excuse that their team makes a significant economic impact to their community to get a bigger or newer stadium. There are widespread stories about many professional team owners saying that they might move their team unless they get a new stadium. The city of Oakland, California is a prime example; both the Oakland A’s in Major League Baseball (MLB) and the Oakland Raiders in the National Football League (NFL) are contemplating moving from Oakland to move out of the very dated Oakland Coliseum (O.co Coliseum).

UNIT II STUDY GUIDE

Facility Planning

BSM 4001, Sport Facilities 2

UNIT x STUDY GUIDE

Title

In the case of both Oakland teams, there is no question that the O.co Coliseum justifiably needs to be replaced. The question is, would it be a good idea to build or lease a new facility for the two teams in Oakland? Of course, it does take research, not just guesses in order to answer that question. The use of a feasibility study could help any organization make the right choice. If the financial numbers from a feasibility study indicate that a project is not viable, then the project should not be undertaken. One other newsworthy item that relates to this is Turner Field in Atlanta and the Atlanta Braves’ move to Cobb County, Georgia. Turner Field was originally the Olympic Stadium for the 1996 Summer Olympic Games. Actually, many Olympic host cities spend massive amounts of money to hastily build venues that will never be used again after the Olympic Games are complete. Long-term planning is not something considered in these cases, and it seems like a big waste of resources. See the second article in the suggested reading section for some interesting pictures of abandoned Olympic venues all over the world. Opening a new or renovated sport facility is the last step in a process that can be an extensive and complex procedure. This chapter discusses what issues to examine during the planning process, suggests strategies for garnering community support, identifies the possible constituents who should be involved in the decision to build a facility, shows how to conduct a needs assessment, describes the types of facilities that can be built, and concludes with an analysis of feasibility studies (Fried, 2015). In the design of any sport facility, whether it is a new facility or a renovation of an existing one, the most critical element is having a good understanding of what activities will be offered for the clients using it. In addition, in any facility planning scenario, it is important to consider the future as well as what is needed today. One of the big questions to ask, as a facility manager who is working on planning is this: How can the building expand in the future? Poorly planned and designed sport facilities can not only lead to issues with maintaining and operating the facility, but they also could lead to more exposure to liability. That is why it is important to make the right decision when selecting a planning and design team; it should include an experienced architect. It is critical to have the right team in place with the proper background and understanding of the unique properties of sport facilities. It is extremely hard to make changes to a facility if it is not planned correctly from the beginning. Imagine what it would be like to have a new $60 million facility in your backyard, only to have to close before the first game was played in it? That happened in Allen, Texas. Please see an article in the suggested reading area about Eagle Stadium, which is now open after more than $10 million of repairs were made by the contractor and architectural firm. As you can see from this example, once the concrete has been poured, it is much harder or nearly impossible to make changes. With forethought and creativity, a new sport facility can be built to perform as well as the athletes and fans it serves. Prior to completing the reading assignments for the unit, please watch this video from Columbia Southern University faculty member, Dr. Tim Rice. Click here to watch the Unit II video, or you may navigate to: Rice, T. (2015, Oct. 16) Unit II Sport Facilities Overview [Video file]. Retrieved from

https://www.youtube.com/watch?v=F1GkKWjZb5I To turn on closed captioning in the video, click the captions icon at the bottom of the video. Click here to access a transcript of the Unit II video.

Reference Fried, G. (2015). Managing sports facilities (3rd ed.). Champaign, IL: Human Kinetics.

BSM 4001, Sport Facilities 3

UNIT x STUDY GUIDE

Title

Suggested Reading Read the article below about the Phoenix Coyotes facility that was mentioned in the unit lesson. Garofalo, P., & Waldron, T. (2012, September) If you build it, they might not come: The risky economics of

sports stadiums. The Atlantic. Retrieved from http://www.theatlantic.com/business/archive/2012/09/if- you-build-it-they-might-not-come-the-risky-economics-of-sports-stadiums/260900/

This is the article mentioned in the unit lesson about the abandoned Olympic sites. Take a few minutes to read this article and view the photos to see what these formerly great sites look like today. Miklos, V. (2013). After the games: Photographs of decaying Olympic sites. io9. Retrieved from

http://io9.com/after-the-games-photographs-of-decaying-olympic-sites-503372635 Read the article below for more on the $60 million Eagle Stadium in Allen, Texas and the issues that the venue has dealt with due to poor planning: Texas school district’s $60M stadium to reopen for graduation after repairs. (2015). Retrieved from

http://www.cbsnews.com/news/eagle-stadium-60-million-high-school-football-stadium-to-reopen-in- texas-after-repairs